Find step-by-step product walkthroughs, capacity formula explanations, and upcoming video tutorials and documentation.
Step-by-Step Product Walkthroughs
Follow the common workflows for capacity planning, hiring, compliance, and scheduling.
Capacity Calculator
Forecast workload, capacity, utilization, and FTE adjustment from MRR, endpoints, and team inputs.
- 1Set global productivity assumptions: working days, standard work hours, target utilization, annual PTO, and onboarding spike multiplier.
- 2Use Teams & Departments to define departments, teams, roles, FTE counts, labor hours, MRR, and endpoints.
- 3Return to Capacity Calculator and review Current Workload, Net Capacity, Projected Workload, and FTE Adjust.
- 4Use Work Role Analysis to switch between Dept, Team, Role, and Layered views when validating staffing pressure.
- 5Create draft job requisitions from understaffed role recommendations when a hiring gap is present.
Teams & Departments
Maintain the shared roster structure used by capacity, salary, scheduling, and cost analysis.
- 1Create departments that match how the MSP operates, such as Service, NOC, Security, or Field Services.
- 2Add teams under each department and assign the roles that actually work on that team.
- 3Enter FTE counts and labor hours for each role so capacity calculations have real workload data.
- 4Add compensation assumptions and work states for roles that need Salary Advisor or loaded-cost analysis.
- 5Use role actions to jump into Salary Advisor or Scheduling Optimizer with the selected role context.
Compensation
Manage company salary records, market benchmarks (Advisor), and exempt-threshold review in one place.
- 1Open Compensation and start on Records to import or edit opaque employee salary rows.
- 2Switch to Advisor to benchmark a role by experience, company size, industry, and state.
- 3Save market benchmarks back to Teams roster roles when the role already exists.
- 4Switch to Exempt to upload an Excel file (Name, Title, State, Salary) for threshold compliance.
- 5Review under-threshold employees and export enriched results for HR or finance review.
Scheduling Optimizer
Model coverage and shift changes while preserving employee morale.
- 1Start from Teams & Departments roster roles or upload schedule details with current shifts and days per week.
- 2Set peak hours, required staffing levels, preferred shift length, and workweek preferences.
- 3Run optimization to compare current coverage against recommended coverage.
- 4Review morale impact, disruption level, and night-shift reduction before making schedule changes.
- 5Export the recommended schedule when ready to share with managers.
Growth Projections
Plan phased MRR or endpoint growth and see when hiring, training, ramp, and full productivity occur.
- 1Open the saved capacity plan and define growth phases by date range, MRR delta, or endpoint delta.
- 2Set training days, ramp-up days, and hiring lead time.
- 3Review the Growth & Effective Hiring Timeline for phase starts and Hire / Train / Ramp / Full markers.
- 4Use the Monthly Hiring Schedule to see hires, in-training headcount, ramping headcount, and fully productive headcount.
- 5Adjust phases until effective FTE catches up to demand at the right time.
Smart Hiring Process
Move from capacity gap to optimization, growth planning, pricing, requisition, and hiring workflow.
- 1Review optimization recommendations before adding new headcount.
- 2Select a growth scenario and inspect ramp timing.
- 3Price the target role with Salary Advisor if the plan includes that feature.
- 4Create a draft requisition with role, state, headcount, salary, and loaded cost context.
- 5Move the requisition through draft, open, paused, and filled statuses.
Job Requisitions
Track hiring needs created manually or from capacity and salary workflows.
- 1Create a draft requisition manually or from a recommendation.
- 2Confirm role, state, headcount, salary range, loaded cost, and notes.
- 3Use statuses to track draft, open, paused, and filled requisitions.
- 4Review open headcount and estimated loaded cost across all active requisitions.
- 5Mark filled requisitions when hiring is complete.